Zero-CAPEX, 24/7 behind-the-meter baseload power, industrial cooling, and distilled make-up water — powered by maintenance-free Hydro Puls Direct-Drive (HPDD) technology.
AI workloads and hyperscale cloud infrastructure are driving unprecedented power density. Yet operators face three growing barriers to deployment:
Utility substations are congested, delaying time-to-power by 3 to 7+ years.
High-density racks require continuous thermal rejection and clean make-up water.
Conventional on-site generation ties up capital and creates noise and permitting hurdles.
Through a strategic financial partnership, Hydro Puls Systems delivers on-site power and cooling as a fully financed EaaS solution. Operators pay strictly for delivered utilities under a predictable, long-term service agreement.

At the core of our EaaS offering is the patented Hydro Puls Direct-Drive (HPDD) architecture — a containerized, modular utility hub engineered for continuous 24/7 mission-critical operation.
Hermetically sealed, opposed free-piston hydraulic core. No crankshafts, cams, or high-wear linkages — eliminates conventional overhaul cycles.
Closed-loop 230°C internal thermal cycle. Zero exhaust stack (Delta Mass = 0.000 kg). ~63% net electrical efficiency.
Every HPDD module co-produces industrial cooling alongside electrical output, directly reducing PUE and chiller loads.
Co-produces 0.42 L/kWh of pure water on-site (4,160 L/hr per 10 MW) — no strain on municipal water supplies.

Standardized 20ft/40ft containerized skids allow phased capacity expansion aligned directly with data hall commissioning. The 100 MW reference deployment uses 10 × 10 MW containerized skids, representing an aggregate system value of €78,620,000 (€786,200/MW) over a 20-year economic lifespan.

HPDD EaaS eliminates upfront CAPEX, grid delays, maintenance burdens, and emissions permitting — delivering integrated power, cooling, and pure water in a single service agreement.

Annual utility & infrastructure TCO in EUR millions for 876,000 MWh/year. Includes power + 30% cooling + 364,416 m³/yr distilled water. $0 Customer CAPEX for HPDD options.


HPDD EaaS (Ammonia) saves €9.30M/yr vs. Grid + Newbuild — totaling €186M over 20 years. The Green Ammonia option delivers 100% CO2-free baseload at €162.50/MWh.
Unlocks €40M+ in capital to reallocate directly toward high-yield AI servers and GPU acceleration hardware.
Eliminates the 30% electrical power overhead typically consumed by mechanical chiller plants.
Co-produces 364,416 m³/yr (41,600 L/hr) of pure distilled water, removing dependency on municipal utilities.
Delivers immediate, verifiable zero-emission compliance without reliance on carbon offset certificates.

www.hydropulssystems.com
Data centers - energy generation / Main Applications | Hydro Puls Direct Drive (HPDD)
Hier is de strategisch opgebouwde en technisch onderbouwde SEO-tekst voor de Data Center Applications pagina op de website van Hydro Puls Systems. Deze pagina is specifiek gericht op de grootste pijnpunten van de datacentersector: het enorme stroomverbruik, de stijgende koelingsbehoefte (PUE-reductie), netcongestie en de noodzaak om van traditionele diesel-backupsystemen af te stappen. Meta-Informatie (Achter de schermen voor Google) Meta Title: Next-Gen Data Center Cooling & Power Infrastruct


Global demand from AI data centers and hyperscale developments significantly exceeds HPDD manufacturing capacity for the coming years. Production slots are allocated on a priority reservation basis for qualified EaaS projects.
Hydro Puls Direct-Drive (HPDD) | www.hydropulssystems.com | [email protected]
Energy & Cooling as a Service for Data Centers